The pyramid is highlighted in red, and its
two diagonals are extended beyond the end
of the pyramid to the north-east and north-
west. The mass of squiggly lines above the
pyramid is the Delta of the Nile River, and,
as you can see the two diagonals encase the
Nile neatly and entirely. IS THAT A
COINCIDENCE???
Yes, I'm sure that the way the Egyptians did
this was to have someone walk hundreds of
miles to the end of the delta and hold a
really, really long piece of string while
someone walked all the way back to the site
of the pyramid. Then, those two people
stood there while two more people repeated
the process on the other side of the Pyramid.
Just so that they could build a big building in
such a way that its diagonals lie on those two
lines.
NOW THAT IS LIKELY????
Here is what really happened: A couple of
aliens, flying high enough over the earth to
be able to see where the Nile Delta's origin
is, easily saw what orientation the pyramid
would need to be in order to have its
diagonals lie on those two lines.
Second piece of evidence:
The big dark shape on the upper left of this
diagram is the great pyramid. If you look at
the compass rose in the bottom right, you can
see that the pyramid is lined up exactly with
the magnetic North Pole, a difference of
only 16 minutes, or some absurdly small
number like that (there are 60 minutes in
one degree). COINCIDENCE? How could the
Egyptians possibly have built their pyramid
facing the exact magnetic North Pole without
even having a compass? FYI, a compass was
not invented for a few thousand years after
the ancient Egyptians were long gone? IS
THAT LIKELY????
This is how it really worked: Those aliens,
abundant in their knowledge and drowning
in technology, came along and using their
compasses, they landed on earth and found
the actual magnetic north and south poles.
THEN THEY BUILT THE PYRAMIDS!
Now look at this:
This is a photograph of the Great Pyramid of
Giza, and its neighbor, as seen from the
Sphinx, on the evening of the summer
solstice. As you can see, the sun is setting in
the exact center of the two pyramids.
COINCIDENCE???
For the Egyptians to be able to do this, they
must have known the day of the summer
solstice, and they therefore, must have
known the exact length of the year, or
365.25; once again, a fact not discovered
until long after the Egyptians were gone.
HOW LIKELY IS THAT???
The real story goes like this: Those
meddling aliens, in all of their infinite
wisdom, saw the earth upon entering the
solar system, and by calculating the size of its
revolutions around the sun, the velocity it
was at which it traveled and the angle of its
axis of rotation, they were able to easily
calculate the longest day of the year or the
length of the year.
THEN BUILT THE PYRAMIDS!
Here is another photo:
This is a photograph taken on the day of the
winter solstice from the entrance of the
Great Pyramid. The Big shape silhouetted in
the middle of the photograph is the Sphinx.
Since this is only a photograph, and not a
movie, you can't get the full effect. But
even in the photo, you can see that the sun is
tracing around the Sphinx's head. In
actuality, the sun rises exactly at the left side
of the base of the Sphinx's head. Then it
traces it all the way around until it sets on
the right side of the Sphinx's head.
COINCIDENCE???
Had the Egyptians done this, since this
occurs only on the day of the winter solstice,
they would have had to have known the
exact length of a year.
IS THAT LIKELY???
It's those aliens, who after finding the length
of the year, found the shortest day of the
year, and then built their Sphinx and
Pyramid accordingly.
Consider this:
This above image is a diagram of the stars of
the Belt of Orion. Now look at the diagram
of the pyramids below.
Though this fact is not as remarkable, the
positioning of the three Pyramids of Giza are
exactly aligned with the position of the three
stars in the belt of Orion, both in position
and in size. While it is possible, it would
create many difficulties for the Egyptians in
terms of measuring huge distances. Not only
this, but in fact, at the time that the
pyramids were supposedly built (about 3000
BC), the stars that make up the Belt of Orion
were not exactly at the correct angle to
match up with the pyramids. If the location
of the stars is traced back over thousands of
years, the time at which the belt is exactly
aligned with the pyramids is in fact 10,500
BC. A time when there were supposedly no
civilized humans living on the earth.
Another fact to support this is, if you
consider the Sphinx, a lion with a human
head and then look at the size of the body,
you can see that the body is perfectly
proportioned for the head of a lion, not the
human head. This human head looks tiny
and silly sitting on top of the body. This is
because the Sphinx was actually built in
10,500 BC, around the same time as the
pyramids, with a real head of a lion.
Evidence to support this is that there are
signs of water erosion all over the Sphinx.
The last time that there was any water
nearby, aside from the Nile is around 10,000
BC. Also, the constellation of Leo the Lion
(thus closely related to the Sphinx), was in
fact rising directly behind the sun in 10,500
BC.
Are they saying that the Egyptians built their
pyramids to be in the exact shape of Orion's
Belt, but purposely aligned them differently
from what was actually in the sky? That
after they built the Sphinx, they purposely
made the head look small and funny? Then,
they broke their backs carrying water from
the Nile just so that they could put water
erosion lines all over the body?????
In fact, no Egyptian did it at all. The aliens,
with their plethora of wisdom, came down
in the year 10,500 BC and built the Pyramids
and the Sphinx. They built it with a head of
a lion to match the Belt of Orion, as well as
the constellation of Leo. Thousands of years
later, Ramses, the egomaniacal dictator-
pharaoh of Egypt, decided that he didn't like
having the head of a lion on top of the statue
in his land. So, he had a head in his own
likeness constructed instead. But the
Egyptians, not being very skilled at huge
masonry, built the head somewhat too small.
Why is it that the great Pyramids of Giza,
built in 3,000, are perfect, and still standing
as tall as the day they were built? (Aside
from the capstone and the polished stones,
which were stripped by humans in the
building of Cairo) The other Pyramids,
which were supposedly built about 500 years
later, all have shoddy masonry, and are
crumbling down. An example of this is the
famous 'bent' pyramid, which started out
with the sides being built at one angle, then
suddenly shifts in the middle to a shallower
angle. This is because the angle at which it
was started was much too steep for it to
stand when finished. It is because the
Egyptian pharaohs saw the great pyramids
standing on their land and decided that they
wanted pyramids of their own. But they
found that it was much harder to do than
was expected and ended up building silly
looking structures that don't even come close
to comparing with the magnitude of
elegance emanating from the great
pyramids.
Other startling evidence:
If you take the perimeter of the pyramid and
divide it by two times the height, you get a
number that is exactly equivalent to the
number pi (3.14159...) up to the fifteenth
digit. The chances of this phenomenon
happening by sheer chance is remarkably
small. Did the ancient Egyptians know what
the number pi was? Not likely, seeing as it
was a number not calculated accurately to
the fourth digit until the 6th century, and
the pyramids calculate it to the fifteenth.
What about the fact that even though the
sides of the base of the pyramid are some
757 feet long, it still forms an almost perfect
square? Every angle in the base is exactly
90 degrees. In fact, the sides have a
difference in length of something like two
centimeters, which is an incredibly small
amount.
What about the fact that although the
Egyptians kept very careful records about
everything they ever did; every king they
had, every war they fought, and every
structure they built, there were no records of
them ever having built the pyramids?
What about the fact that the Egyptians had
not even invented the wheel yet, but the
blocks that they had to carry to build the
pyramids weighed about 2 tons each? 4,000
lbs.? What did they do... use cement? In
fact, they used so much stone, that if you took
all of the stone they used and cut it into 1
foot square blocks, it would extend 2/3 of the
way around the earth!!!
If you take the line of longitude that the
pyramid lies on and the latitude that the
pyramid lies on, 31 degrees north by 31
degrees west (the fact that they are the same
number is a coincidence???) they are the
two lines that cover the most combined land
area in the world. In essence, the pyramid is
the center of all of the land mass of the
whole earth!!!!
How about the fact that a group of modern
scientists attempted to build a pyramid out
next to the real one using modern
technologies, and after something like 100
days, succeeded in building one about 1/40
of the size of the real one????
Did you know that the height of the pyramid
(481 feet) is almost exactly 1/1,000,000,000
of the distance from the earth to the sun
(480.6 billion feet)?
What about all of that fungi that was found
in King Tutu's chamber? Fungi which has
never before been seen on earth? What
about the Pharaoh's curse????? You decide,
who built the Pyramids?????
This is featured post 1 title
Replace these every slider sentences with your featured post descriptions.Go to Blogger edit html and find these sentences.Now replace these with your own descriptions.This theme is Bloggerized by Lasantha - Premiumbloggertemplates.com.
This is featured post 2 title
Replace these every slider sentences with your featured post descriptions.Go to Blogger edit html and find these sentences.Now replace these with your own descriptions.This theme is Bloggerized by Lasantha - Premiumbloggertemplates.com.
This is featured post 3 title
Replace these every slider sentences with your featured post descriptions.Go to Blogger edit html and find these sentences.Now replace these with your own descriptions.This theme is Bloggerized by Lasantha - Premiumbloggertemplates.com.
Friday, 30 March 2012
Evidence for alien can built giza pyramids
Wembley stadium
Wembley Stadium (often referred to simply as
Wembley , pronounced /ˈwɛmbli/ , or
sometimes as the New Wembley ) is a football
stadium located in Wembley Park , in the
Borough of Brent, London , England . It opened
in 2007 and was built on the site of the previous
1923 Wembley Stadium . The earlier Wembley
stadium, originally called the Empire Stadium,
was often referred to as "The Twin Towers" and
was one of the world's most famous football
stadiums until its demolition in 2003. [5]
It is a UEFA category four stadium . The 90,000-
capacity venue (105,000 combined seating and
standing) is the second largest stadium in
Europe, and serves as England's national
stadium . It is the home venue of the England
national football team , and hosts the latter
stages of the top level domestic club cup
competition, the FA Cup . It is owned by English
football 's governing body, The Football
Association (The FA), through their subsidiary
Wembley National Stadium Ltd (WNSL).
Designed by Foster and Partners and Populous
(then HOK Sport), it includes a partially
retractable roof. A signature feature of the
stadium, following on from the old Wembley's
distinctive Twin Towers, is the 134 metres
(440 ft) high Wembley Arch. With a span of 317
metres (1,040 ft), this steel arch is the longest
single span roof structure in the world and,
uniquely for a stadium, requires beacons for low
flying aircraft. The stadium was built by
Australian firm Multiplex at a cost of
£798 million. The old Wembley closed in
October 2000, with demolition originally
intended for that December and the new
stadium due to open in 2003. After delays to
the project, with demolition first started in
September 2002, the old Wembley was not
completely demolished until February 2003,
with the new stadium scheduled to open in time
for the 2006 FA Cup Final . After further delays,
the stadium was delivered nearly a year late,
leading to legal disputes between WNSL and
Multiplex, who ultimately made a significant loss
on the project. The stadium was handed over
on 9 March 2007, in time to host the 2007 FA
Cup Final .
In international football, the stadium was a
central component of the failed English 2018
and 2022 FIFA World Cup bids . In 2012 it will
host the football finals of the London Olympics .
In club football, in addition to the FA Cup the
stadium also hosts the showpiece season
opening game the FA Community Shield match,
played in August between the winners of the FA
Cup and the top-level Premier League . In mid-
season it also hosts the finals of the Football
League Cup and Football League Trophy . At the
end of the domestic season the stadium also
hosts the finals of the Football League play-offs .
In European football, it hosted the 2011
Champions League Final , and will host the final
again in 2013 . In friendly tournaments, since
2009 it has been the venue of the summer
Wembley Cup. Outside of football, the stadium
also hosts major rugby league games, such as
the Challenge Cup and International Rugby
League. The stadium is also an annual regular
season venue for the American National Football
League's International Series , the first such
venue outside North America. Non-sporting
uses include large music concerts such as
Concert for Diana , Live Earth and the
Summertime Ball.
Stadium
Wembley Stadium exterior
Wembley was designed by architects Foster +
Partners and Populous (known as HOK Sport at
the time of the design phase and construction)
and with engineers Mott MacDonald , built by
Australian company Brookfield Multiplex and
funded by Sport England , WNSL (Wembley
National Stadium Limited), the Football
Association , the Department for Culture Media
and Sport and the London Development Agency .
It is one of the most expensive stadiums ever
built at a cost of £798 million (After New
Meadowlands Stadium )[6][7] and has the
largest roof-covered seating capacity in the
world. Nathaniel Lichfield and Partners was
appointed to assist Wembley National Stadium
Limited in preparing the scheme for a new
stadium and to obtain planning and listed
building permission for the development. [8]
Wembley Stadium interior
The all-seater stadium is based around a bowl
design with a capacity of 90,000, protected
from the elements by a sliding roof that does
not completely enclose it. It can also be adapted
as an athletic stadium by erecting a temporary
platform over the lowest tier of seating. [9] The
stadium's signature feature is a circular section
lattice arch of 7 m (23 ft) internal diameter with
a 315 m (1,033 ft) span, erected some 22° off
true, and rising to 133 m (436 ft). It supports all
the weight of the north roof and 60% of the
weight of the retractable roof on the southern
side. [10] The archway is the world's longest
unsupported roof structure. [11] Instead of the
39 steps climbed, in the original stadium, to
enter the Royal Box and collect a trophy, there
are now 107. [12]
A "platform system" has been designed to
convert the stadium for athletics use, but its use
would decrease the stadium's capacity to
approximately 60,000. [13] No athletics events
( track and field ) have taken place at the stadium,
and none are scheduled. [ citation needed ] The
conversion for athletics use was a condition of
part of the lottery funding the stadium received,
but to convert it would take weeks of work and
cost millions of pounds. [14]
Construction
The stadium in its very early stages of
construction c. August 2003
The initial plan for the reconstruction of
Wembley was for demolition to begin before
Christmas 2000, and for the new stadium to be
completed some time during 2003, but this
work was delayed by a succession of financial
and legal difficulties. In 2004, the London Mayor
and Brent Council also announced wider plans
for the regeneration of Wembley , taking in the
arena and the surrounding areas as well as the
stadium, to be implemented over two or three
decades.
Delays to the construction project started as far
back as 2003. In December 2003, the
constructors of the arch, subcontractors
Cleveland Bridge, warned Multiplex about rising
costs and a delay on the steel job of almost a
year due to Multiplex design changes which
Multiplex rejected. Cleveland Bridge withdrew
from the project and replaced by Dutch firm
Hollandia with all the attendant problems of
starting over. 2004 also saw errors, most
notably a fatal accident involving carpenter
Patrick O'Sullivan for which construction firm PC
Harrington Contractors were fined £150,000 in
relation to breaches of health and safety laws.
[15]
In October 2005, Sports Minister Richard
Caborn announced: "They say the Cup Final will
be there, barring six feet of snow or something
like that". By November 2005, WNSL were still
hopeful of a handover date of 31 March, in time
for the cup final on 13 May. However in
December 2005, the builders admitted that
there was a "material risk" that the stadium
might not be ready in time for the final. [16][17]
In February 2006 these worries were confirmed,
with the FA moving the game to Cardiff 's
Millennium Stadium .
Construction of the new Wembley, looking
east, taken January 2006
On 20 March 2006, a steel rafter in the roof of
the new development fell by a foot and a half,
forcing 3,000 workers to evacuate the stadium
and raising further doubts over the completion
date which was already behind schedule. [18]
On 23 March 2006, sewers beneath the stadium
buckled due to ground movement. [19] GMB
Union leader Steve Kelly said that the problem
had been caused by the pipes not being properly
laid, and that the repair would take months.
Rumours circulated that the reason for the
blockage was due to Multiplex failing to pay the
contractors who laid the pipes who then filled in
the pipes with concrete. A spokesman for
developers Multiplex said that they did not
believe this would "have any impact on the
completion of the stadium", which was then
scheduled to be completed on 31 March 2006.
On 30 March 2006, the developers announced
that Wembley Stadium would not be ready until
2007. [20] All competitions and concerts
planned were to be moved to suitable locations.
On 19 June 2006 it was announced that the turf
had been laid. On 19 October 2006 it was
announced that the venue was now set to open
in early 2007 after the dispute between The
Football Association and Multiplex had finally
been settled. WNSL was expected to pay around
£36m to Multiplex, on top of the amount of the
original fixed-price contract. The total cost of
the project (including local transport
infrastructure redevelopment and the cost of
financing) was estimated to be £1 billion
(roughly US$1.97 billion).
Handover and opening
The Bobby Moore Sculpture stands outside
the stadium entrance, looking down
Wembley Way
The new stadium was completed and handed
over to the FA on 9 March 2007. The official
Wembley Stadium website had announced that
the stadium would be open for public viewing
for local residents of Brent on 3 March 2007,
however this was delayed by two weeks and
instead happened on 17 March.
While the stadium had hosted football matches
since the handover in March, the stadium was
officially opened on Saturday 19 May, with the
staging of the 2007 FA Cup Final . Eight days
before that on Friday 11 May, the Bobby Moore
Sculpture had been unveiled by Sir Bobby
Charlton outside the stadium entrance, as the
"finishing touch" to the completion of the
stadium. The twice life-size bronze statue,
sculpted by Philip Jackson , depicts England's
1966 World Cup winning captain Bobby Moore,
looking down Olympic Way . [21][22][23]
Structure
The stadium contains 2,618 toilets, more
than any other venue in the world. [24]
The stadium has a circumference of 1 km
(0.62 mi). [25]
The bowl volume is listed at 1,139,100 m 3 ,
somewhat smaller than the Millennium
Stadium in Cardiff, but with a greater seating
capacity. [26]
At its peak, there were more than 3,500
construction workers on site. [27]
4,000 separate piles form the foundations
of the new stadium, [25] the deepest of
which is 35 m (115 ft). [25]
There are 56 km (35 mi) of heavy-duty
power cables in the stadium. [25]
90,000 m 3 (120,000 yd 3 ) of concrete and
23,000 tonnes (25,000 short tons) of steel
were used in the construction of the new
stadium. [25]
The total length of the escalators is 400 m
(¼ mi). [25]
The Wembley Arch has a cross-sectional
diameter greater than that of a cross-
channel Eurostar train . [28][29]
Pitch
Aerial of the Wembley Stadium pitch
The new pitch is 13 ft (4.0 m) lower than the
previous pitch. The pitch size, as lined for
association football, is 115 yd (105 m) long by
75 yd (69 m) wide, slightly narrower than the
old Wembley, as required by the UEFA stadium
categories for a category four stadium, the top
category.
Since the completion of the new Wembley, the
pitch has come into disrepute since it was
described as being "no good" and "not in the
condition that Wembley used to be known for"
by Slaven Bilić before the game between
England and the team he managed, Croatia . [30]
It was confirmed when the pitch was terribly cut
up during the game, which was blamed by some
[31] as the reason England did not qualify for
UEFA Euro 2008 . [32] The Football Association
admitted in April 2009 after the FA Cup semi-
finals that improvements are needed to the
Wembley pitch after criticism of the surface by
Sir Alex Ferguson, Arsène Wenger and David
Moyes . The grass has been relaid ten times since
the stadium re-opened in 2007 and was relaid
again in the summer of 2009, ahead of the
2009 Community Shield. [33][34]
In March 2010, the surface was relaid for the
10th time since 2007, when the stadium was
built. In April 2010, the pitch was again
criticised following the FA Cup semi-finals ,
during which the players found it difficult to
keep their footing and the surface cut up despite
the dry conditions. Tottenham Hotspur boss
Harry Redknapp labelled it a "disgrace" after his
side's semi-final defeat to Portsmouth. [35]
After the 2010 FA Cup Final , Chelsea captain
John Terry said, "The pitch ruined the final. It’s
probably the worst pitch we’ve played on all
year. It was not good enough for a Wembley
pitch." [36] It was relaid with Desso semi-
artificial pitch, ahead of the 2010 community
shield game between Chelsea and Manchester
United . Michael Owen , who previously criticized
the pitch for causing him injury, said that it was
much improved. [37]
Covering
Close-Up of the Arch
The stadium roof has an area of 40,000 m 2 , of
which 13,722 m 2 is movable. [26] The primary
reason for the sliding roof was to avoid shading
the pitch, as grass demands direct sunlight to
grow effectively. [38] The sliding roof design
minimises the shadow by having the roof pulled
back on the east, west and south. [39] Angus
Campbell, chief architect, also said that an aim
was for the pitch to be in sunlight during the
match between the beginning of May and the
end of June, between 3pm and 5pm, which is
when the FA and World cups would be played.
However it was mentioned during live
commentary of the FA Cup Final in 2007 that
the pitch was in partial shade at the start at 3
pm and also during the match. [40]
The stadium roof rises to 52 metres above the
pitch and is supported by an arch rising 133
metres above the level of the external
concourse. With a span of 315 metres, the arch
is the longest single span roof structure in the
world. [25]
Litigation
The Australian firm Multiplex, which was the
main contractor on Wembley Stadium, made
significant losses on the project. [41][42] In an
attempt to recoup some of those losses, the
firm has initiated a number of legal cases
against its sub-contractors and consultants. [43]
The largest of these - the largest legal claim in
UK legal history - is a claim for £253 million
against the structural engineering consultants
Mott Macdonald . [44] In preliminary hearings
the two architecture practices which worked for
Multiplex on the project have been ordered to
allow Multiplex access to their records in order
for them to build a case. The practices, Foster +
Partners and Populous , estimate the costs of
providing access and answering Multiplex's
queries at £5 million. [45] The case is not due to
be heard until January 2011. [46] Mott
Macdonald has issued a counter-claim for
unpaid fees of £250,000. [44]
Multiplex has also taken the original steel
contractor, Cleveland Bridge, to court in order to
claim up to £38 million [47] compensation for
costs resulting from Cleveland Bridge walking
away from the job. Cleveland Bridge, in turn,
claimed up to £15 million from Multiplex. The
case was finally resolved in September 2008
with Cleveland Bridge ordered to pay
£6.1 million in damages and 20% of Multiplex's
costs after the court found Cleveland Bridge was
in the wrong to walk off site. The judge criticised
both sides for allowing the case to reach court,
pointing out that total costs were £22 million,
including £1 million for photocopying. [48]
Multiplex's ultimate bill is estimated to be over
£10 million.
Multiplex is also contesting a claim from its
concrete contractor, PC Harrington, that
Multiplex owes £13.4 million to PC Harrington.
[49]
The dispute between Multiplex (now known as
Brookfield) and Mott Macdonald was settled out
of court in June 2010, the judge having warned
that costs were likely to be more than
£74 million. [50]
Tenants
Wembley Stadium during the 2007 Race of
Champions
The English national football team is a major
user of Wembley Stadium. Given the ownership
by The Football Association as of 10 March
2007, the League Cup final moved back to
Wembley from Cardiff following the FA Cup final
and FA Community Shield . Other showpiece
football matches that were previously staged at
Wembley, such as the Football League
promotion play-offs and the Football League
Trophy final, have returned to the stadium, as
has the Football Conference play-off final.
Additionally, the Rugby League Challenge Cup
final returned to Wembley Stadium in 2007. The
new Wembley is a significant part of the plan for
the 2012 Summer Olympics in London; the
stadium will be the site of several games in both
the men's and women's football tournaments,
with the finals planned to be held there. [51]
Additionally, Wembley is one of the 12 2015
Rugby World Cup venues, for which pitch
changes will have to be made.
The Race of Champions staged their 2007 and
2008 events at the stadium.
Wembley has had a long association with
American Football . A USFL game was staged
there in 1984, and between 1986 and 1993 the
old Wembley stadium hosted eight NFL
exhibition games featuring 13 different NFL
teams. [52] Since the new Wembley Stadium
opened in 2007 Wembley has hosted games
during the NFL regular season. As a result of
this, NFL commissioner Roger Goodell stated in
October 2009 that "he expects the NFL will start
playing multiple regular-season games in Britain
in the next few years, an expansion that could
lead to putting a franchise in London." [53] In
2012, the league announced that the St. Louis
Rams would become a permanent tenant of
Wembley Stadium, playing an annual game at
the stadium every year from 2012 to 2014; part
of the reason the Rams were chosen was the
fact that the team is owned by Stan Kroenke ,
who also is majority shareholder in a local
Premier League team, Arsenal .
Music
The stage at the Live Earth concert held at
Wembley on 7 July 2007.
Besides football, Wembley can be configured to
hold many other events, particularly major
concerts.
The first concert at the new stadium was given
by George Michael on 9 June 2007. [54] Bon Jovi
were scheduled to be the first artists to perform
at the new Wembley but the late completion of
the stadium saw the concerts relocated to the
National Bowl and the KC Stadium .
Muse became the first band to sell out the new
stadium on 16 and 17 June 2007, and released
a live DVD of the performance.
Other acts to have performed at the stadium are
Metallica, Foo Fighters, Madonna, Coldplay ,
Oasis , Take That and AC/DC . [55]
Wembley stadium hosted Take That Present:
The Circus Live for 4 nights in summer 2009.
The tour became the fastest selling tour in UK in
history [56] before that record was broken by
Take That two years later with their Progress
Live tour.
Two large charity concerts have been held at the
new Wembley stadium, the Concert for Diana , a
memorial concert to commemorate ten years
after the Death of Princess Diana , and Live
Earth, a concert hosted at Wembley as part of
the Live Earth Foundation, committed to
combating climate change .
Take That concert
95.8 Capital FM 's Summertime Ball, which was
previously hosted with 55,000 spectators at the
Arsenal Emirates Stadium and slightly less in
Hyde Park (as Party in the Park ), was hosted at
Wembley Stadium on 6 June 2010, and was
headlined by Rihanna and Usher . The move to
Wembley allowed many more fans to watch the
annual music event which has previously lasted
over 5 hours with more than 15 performers. It
is thought to be the biggest commercial music
event held at the stadium. It will return to the
Stadium in 2011, with an even larger concert.
American punk rock band Green Day continued
their world tour, playing at Wembley on 19 June
2010. The gig was Green Day's biggest audience
yet. [57]
Muse returned to Wembley Stadium on 10 and
11 September 2010 as part of their Resistance
Tour to a sell-out crowd, having previously
played there in June 2007.
Madonna played Wembley in 2008 during her
Sticky and Sweet Tour , to a sold-out audience of
74,000. The event has surpassed all gross
revenue for a single concert at Wembley,
grossing nearly $12 million USD.
Watch the construction video on the below link.
Watch "EC: Wembley Stadium 1/5" on YouTube
Thursday, 29 March 2012
Chennai metro rail
Chennai Metro Rail Limited
(CMRL) [1]
Locale Chennai , Tamil Nadu
Transit type Rapid Transit
Number of
lines
2 (under construction in Phase I)
3 (proposed in Phase II)
Number of
stations 41 (Phase I + extension)
Chief
executive K Rajaraman, MD [2]
Headquarters Chennai
Website http://
www.chennaimetrorail.gov.in/
Operation
Operation
will start
2013 (Elevated Section on
Corridor 2)
Operator(s) CMRL
Number of
vehicles 42 (Phase I)
Train length 86.5 m
Technical
System
length
117.046 km (72.73 mi) [Phase I,
extension and Phase II]
Track gauge standard gauge
Electrification 25 kV, 50 Hz AC through
overhead catenary
Top speed 80 km/h (50 mph)
The Chennai Metro (Tamil:
is a rapid transit
system in Chennai, Tamil Nadu , India. The Phase
I of the project consisting of two corridors
covering a length of 45.1 km is under
construction. The elevated section of the project
is scheduled to be operational by 2013 and the
entire project is scheduled to be completed by
the financial year 2014-2015. About 55% of the
corridors in Phase I is underground and the
remaining is elevated.
Background
This unreferenced section requires
citations to ensure verifiability .
Chennai is the 4th largest metropolitan city in
India. Chennai, often known as the Detroit of
Asia , is widely known for its presence in the
automotive industry and has attracted several
global automakers to set up their factories in the
city becoming one of the global leaders in the
industry. Apart from automobiles, it also has
development centres set up by many software
companies which contributed 14% of India's
total software exports of
144,214 crore ( US$ 28.77 billion) during
2006–07, making it the second-largest exporter
of software in the country, behind Bangalore.
Based on all these industrial and technological
advancements, urban population has risen
rapidly, requiring need for faster and safer
transportation at all times. The city already has
multiple modes of transportation. A bus system
is run by the Chennai MTC and is augmented by
the Chennai suburban railway network run by
the Southern Railway . In addition to this, the
Chennai Corporation has also implemented the
Chennai MRTS project; an elevated railway
system was sanctioned in 1984 to ease
congestion in central Chennai. However, traffic
congestion was still a big problem for both the
citizens as well as the City's governing body.
Hence, the Chennai Corporation has decided to
implement the Chennai Metro project which will
be another alternate transportation mode to a
metropolis like Chennai. Mr K.Rajaraman IAS,
1989 Batch Officer of Tamil Nadu cadre is the
Managing Director of CMRL.
History
After the success of the Delhi metro , a similar
system was mooted for the city of Chennai by E.
Sreedharan of the DMRC to the then Chief
Minister of Tamil Nadu Karunanidhi .[3] The plan
was later dropped in favour of a highly
ambitious monorail network, spread over the
whole city during Jayalalitha 's tenure.
[4] Karunanidhi revived the metro rail project to
life once again by including it in the 2007-08
State Government's budget, and an amount of
50 crores had been sanctioned for preliminary
works which included a Detailed Project Report
(DPR) to be prepared by the DMRC Rail
Project . The approval for the project was
finally given by the state cabinet on 7 November
2007 [5] and is to be executed by a Special
purpose vehicle, the Chennai Metro Rail Limited
(CMRL).
Corridors
Master Plan prepared by DMRC
A Total of 7 lines have been planned by the
DMRC for Chennai Metro Rail Project. [6]
Line Termini Opening
Date
Length
(km)
Underground
(km)
Underground
stations
Elevated
stations Interchange
Line
1 Tiruvottiyur
Chennai
International
Airport
2014 32.1 14.3 11 6 Suburban,
MRTS , 2
Line
2
Chennai
Central
St. Thomas
Mount 2013 22 9.7 9 8 Suburban,
MRTS , 1
Line
3 Mogappair Tiruvanmiyur 2014 24 10 9 8 4, MRTS
Line
4 Porur Kamarajar
Salai 3
Line
5 Ring Road Ring Road
Line
6
Radhakrishnan
Salai
Kilpauk
Medical
College
2
Line
7
Along NH5
Road
Along NH5
Road
Other Proposals
Several studies and proposals have been made
to identify new lines to augment the two lines
under construction.
Two corridors have been proposed in the
comprehensive transportation study submitted
by Wilbur Smith Associates [7] from
Medavakkam to St. Thomas Mount and
Madhavaram to Lighthouse via Radhakrishnan
Salai.
A metro line from Thiruvanmiyur to
Kottivakkam and beyond via ECR has been
proposed by CMRL in the steering committee
meeting of the department of Highways and
Minor Ports. But it has been decided to defer it
for present and take it up later. This was
proposed as an alternate for the East Coast
Elevated Expressway [8]
A project study was taken up to establish links
between Moolakadai-- Thirumangalam ,
Moolakadai-- Thiruvanmiyur and Luz—
Poonamallee through Iyyappanthangal. [9]
Apart from these, there are demands to extend
the Metro Rail to Tambaram.[10] State
Government is considering extension to
Tambaram. [11]
Proposed MRTS take-over by CMRL
The MRTS , operated by Southern Railway , is
proposed to be taken over by the CMRL thereby
bringing all the elevated tracks and underground
tracks inside the city under one organization.
The Chennai MRTS is a very poorly executed
project and is a loss making enterprise at
present. After the merger, it is proposed to
replace the current EMUs in the MRTS with air-
conditioned coaches with automatic doors.
Watch the video below link
Watch "Chennai Metro Rail - Ambal Nagar to Kasi Theater" on YouTube
Tuesday, 27 March 2012
Taipei 101
Taipei 101 ( Chinese: 台北101 / 臺北101),
formerly known as the Taipei World Financial
Center , is a landmark skyscraper located in
Xinyi District , Taipei, Republic of China (Taiwan ).
The building ranked officially as the world's
tallest from 2004 until the opening of the Burj
Khalifa in Dubai in 2010. In July 2011, the
building was awarded LEED Platinum
certification, the highest award in the
Leadership in Energy and Environmental Design
(LEED) rating system and became the tallest and
largest green building in the world. [3] Taipei
101 was designed by C.Y. Lee & partners and
constructed primarily by KTRT Joint Venture and
Samsung C&T . The tower has served as an icon
of modern Taiwan ever since its opening, and
received the 2004 Emporis Skyscraper Award .
[4] Fireworks launched from Taipei 101 feature
prominently in international New Year's Eve
broadcasts and the structure appears frequently
in travel literature and international media.
Taipei 101 comprises 101 floors above ground
and 5 floors underground. The building was
architecturally created as a symbol of the
evolution of technology and Asian tradition (see
Symbolism ). Its postmodernist approach to
style incorporates traditional design elements
and gives them modern treatments. The tower
is designed to withstand typhoons and
earthquakes. A multi-level shopping mall
adjoining the tower houses hundreds of
fashionable stores, restaurants and clubs.
Taipei 101 is owned by the Taipei Financial
Center Corporation (TFCC) and managed by the
International division of Urban Retail Properties
Corporation based in Chicago. The name
originally planned for the building, Taipei World
Financial Center , until 2003, was derived from
the name of the owner. The original name in
Chinese was literally, Taipei International
Financial Center
Burj khalifa
Former
names Burj Dubai
Record height
Tallest in the world since 2010 [I]
Preceded by Taipei 101
General information
Status Complete
Type Mixed-use
Location Dubai, United Arab Emirates
Coordinates 25°11′49.7″N 55°16′26.8″E
Construction
started January 2004
Completed 2010
Opening 4 January 2010 [1]
Cost USD $ 1.5 billion [2]
Height
Antenna
spire 829.84 m (2,723 ft) [3]
Roof 828 m (2,717 ft) [3]
Top floor 621.3 m (2,038 ft) [3]
Technical details
Floor count
163 habitable floors [3][4]
plus 46 maintenance levels in
the spire [5] and 2 parking
levels in the basement
Floor area 309,473 m 2 (3,331,100 sq ft)
[3]
Design and construction
Main
contractor
SOM, Besix and Arabtec ,
Samsung C&T
Supervision Consultant
Engineer & Architect of Record
Hyder Consulting
Construction Project Manager
Turner Construction
Grocon[6]
Planning Bauer AG and Middle
East Foundations [6]
Lift contractor Otis [6]
VT consultant Lerch Bates[6]
Architect Adrian Smith at SOM
Developer Emaar Properties
Structural
engineer Bill Baker at SOM[7]
Website
burjkhalifa.ae
Burj Khalifa ( Arabic : " Khalifa
Tower"), [8] known as Burj Dubai prior to its
inauguration, is a skyscraper in Dubai, United
Arab Emirates, and is the tallest manmade
structure in the world , at 829.84 m (2,723 ft).
[3][8] Construction began on 21 September
2004, with the exterior of the structure
completed on 1 October 2009. The building
officially opened on 4 January 2010, [1][9] and
is part of the new 2 km 2 (490-acre) flagship
development called Downtown Dubai at the
'First Interchange' along Sheikh Zayed Road ,
near Dubai's main business district. The tower's
architecture and engineering were performed
by Skidmore, Owings and Merrill of Chicago ,
with Adrian Smith as chief architect, and Bill
Baker as chief structural engineer. [10][11] The
primary contractor was Samsung C&T of South
Korea .[12]
The total cost for the project was about US
$1.5 billion; and for the entire "Downtown
Dubai" development, US$20 billion. [13] In
March 2009, Mohamed Ali Alabbar , chairman of
the project's developer, Emaar Properties, said
office space pricing at Burj Khalifa reached US
$4,000 per sq ft (over US$43,000 per m²) and
the Armani Residences , also in Burj Khalifa, sold
for US$3,500 per sq ft (over US$37,500 per
m²). [14]
The project's completion coincided with the
global financial crisis of 2007–2010 , and with
vast overbuilding in the country, led to high
vacancies and foreclosures. [15] With Dubai
mired in debt from its huge ambitions, the
government was forced to seek multibillion
dollar bailouts from its oil-rich neighbor Abu
Dhabi . Subsequently, in a surprise move at its
opening ceremony, the tower was renamed
Burj Khalifa, said to honour the UAE President
Khalifa bin Zayed Al Nahyan for his crucial
support. [16]
Due to the slumping demand in Dubai's
property market, the rents in the Burj Khalifa
plummeted 40% some ten months after its
opening. Out of 900 apartments in the tower,
around 825 were still empty at that time. [17]
[18]
Watch "Burj Khalifa (Burj Dubai) Construction - Animation - U.A.E." on YouTube
Sunday, 25 March 2012
World one tower in mumbai, india
World One
General information
Status Under Construction[1]
Type Residential
Location Upper Worli, Mumbai
Estimated
completion 2014
Cost 2,000 crore ( US$ 399 million)
Height
Roof 442 metres (1,450 ft) [2]
Technical details
Floor count 117 [3]
Elevators 18 [4]
Design and construction
Owner Lodha Group
Main
contractor
Simplex Infrastructures Limited
and ACC
Architect Pei Cobb Freed & Partners,
Leslie E. Robertson Associates
Developer Lodha Group
Website
http://www.world-one.in
World One [5] is a residential skyscraper under
construction in Mumbai . It will be located in
Upper Worli[6] of Mumbai on the plot of a
17.5 [7] acre site, which belonged to Srinivas
Cotton Mills. [2] Lodha Group obtained the plot
for 250 crore ( US$ 49.88 million). [2] The
project will cost 2,000 crore ( US$ 399 million),
be completed by 2014, [8] and will have the
world’s second tallest residential tower once
completed. [9]
It will be rated as Leed Gold Certified building by
the Green Building Council. [10] World One is
designed by Pei Cobb Freed and Partners and
Leslie E. Robertson Associates. [11] The
apartment prices in World One would start from
7.5 crore (US$ 1.5 million) and the most
expensive one be as much as
50 crore ( US$ 9.98 million) [7] Lodha expects
to earn a revenue of
5,000 crore ( US$ 997.5 million) from the sale
of the apartments. [2]
Projected residential height
World One will be the second-tallest all-
residential building in the world upon
completion, if Pentominium , a 516-metre-tall
(1,693 ft) skyscraper under construction in
Dubai, is completed by 2013 as scheduled, and
it currently has the highest projected height of
any residential building under construction In
India.
Design and Features
The 1,450-feet (442 m) World One will come
up at Senapati Bapat Marg and Shankarrao
Nikam Marg in Upper Worli, Mumbai [4] on a
17.5-acre (71,000 m 2 ) plot.
Lodhagroup has partnered with the famous
designer Giorgio Armani`s [12] interior design
studio,Armani/Casa [13] for World One to design
residences and common spaces. Armani who
has also designed residences at Burj Khalifa in
Dubai, his interior design studio Armani/Casa
will do the interiors and decor for a project in
India for the first time. [14]
3 residential towers, a shopping mall and an
office building and a 17 floor Government
Car Park (GCP). [4]
Open-air Observatory called "1000" at
1,000 feet (300 m) elevation[4]
The air is cleaner, quieter and 4.5C cooler at
the top of World One than on the ground. [4]
18 Schindler, Mitsubishi and Otis lifts
travelling up to 8m/sec [4]
20,000 sq ft (1,900 m 2 ) Clubhouse & Spa
over 3 levels [4]
200,000 sq ft (19,000 m 2 ) of landscape
area for residents [2] including:
80,000 sq ft (7,400 m 2 ) Sports Club at a
height of 175 feet (53 m) above ground
level. [2]
100% recycling of water, rainwater
harvesting and solar water heating [4]
VRV Air Conditioning to save electricity[4]
Apartments
The building will have about 300 exclusive
homes, including 3-and-4-bedroom "World
Residences", "World Villas" with their own
private pools and a limited number of duplex
"World Mansions". [4]
Fittings
Kitchens – Bulthaup (Germany) [4]
Bathrooms – Antonio Lupi (Italy),
Dornbracht (Germany), Gessi (Italy), Villeroy
& Boch (Germany/France)
Flooring - Italian marble
Construction
Plot History
Srinivas Mills shut down in 1982. [15] Electricity
was cut off in 1984. 7000 people used to work
in the mill. [15] Then there was a court case that
went on for 22 years and in 2005 March the
Bombay High Court finally delivered its verdict:
Lodha Group will pay a total
160 crore ( US$ 31.92 million). 60 crore
will go to the ex-mill workers, many of
whom died before the court case was
finished. [15]
Lodha Group will build a spinning mill or
garment plant in Maharashtra on an area of
1 lakh sq feet to hire the former mill
workers or their relatives. [15]
In February 2011, the Civil Construction
contract has been given to a JV between
Arabian Construction Company and Simplex
Infrastructure for Rs 450 crore, to be completed
in 38 months. [16]
The tower will require: [4]
250,000 cubic metres of concrete
40,000 sq m of glass
35,000 tonnes of steel rebar
14 million man hours
World one tower in mumbai, india
World One
General information
Status Under Construction[1]
Type Residential
Location Upper Worli, Mumbai
Estimated
completion 2014
Cost 2,000 crore ( US$ 399 million)
Height
Roof 442 metres (1,450 ft) [2]
Technical details
Floor count 117 [3]
Elevators 18 [4]
Design and construction
Owner Lodha Group
Main
contractor
Simplex Infrastructures Limited
and ACC
Architect Pei Cobb Freed & Partners,
Leslie E. Robertson Associates
Developer Lodha Group
Website
http://www.world-one.in
World One [5] is a residential skyscraper under
construction in Mumbai . It will be located in
Upper Worli[6] of Mumbai on the plot of a
17.5 [7] acre site, which belonged to Srinivas
Cotton Mills. [2] Lodha Group obtained the plot
for 250 crore ( US$ 49.88 million). [2] The
project will cost 2,000 crore ( US$ 399 million),
be completed by 2014, [8] and will have the
world’s second tallest residential tower once
completed. [9]
It will be rated as Leed Gold Certified building by
the Green Building Council. [10] World One is
designed by Pei Cobb Freed and Partners and
Leslie E. Robertson Associates. [11] The
apartment prices in World One would start from
7.5 crore (US$ 1.5 million) and the most
expensive one be as much as
50 crore ( US$ 9.98 million) [7] Lodha expects
to earn a revenue of
5,000 crore ( US$ 997.5 million) from the sale
of the apartments. [2]
Projected residential height
World One will be the second-tallest all-
residential building in the world upon
completion, if Pentominium , a 516-metre-tall
(1,693 ft) skyscraper under construction in
Dubai, is completed by 2013 as scheduled, and
it currently has the highest projected height of
any residential building under construction In
India.
Design and Features
The 1,450-feet (442 m) World One will come
up at Senapati Bapat Marg and Shankarrao
Nikam Marg in Upper Worli, Mumbai [4] on a
17.5-acre (71,000 m 2 ) plot.
Lodhagroup has partnered with the famous
designer Giorgio Armani`s [12] interior design
studio,Armani/Casa [13] for World One to design
residences and common spaces. Armani who
has also designed residences at Burj Khalifa in
Dubai, his interior design studio Armani/Casa
will do the interiors and decor for a project in
India for the first time. [14]
3 residential towers, a shopping mall and an
office building and a 17 floor Government
Car Park (GCP). [4]
Open-air Observatory called "1000" at
1,000 feet (300 m) elevation[4]
The air is cleaner, quieter and 4.5C cooler at
the top of World One than on the ground. [4]
18 Schindler, Mitsubishi and Otis lifts
travelling up to 8m/sec [4]
20,000 sq ft (1,900 m 2 ) Clubhouse & Spa
over 3 levels [4]
200,000 sq ft (19,000 m 2 ) of landscape
area for residents [2] including:
80,000 sq ft (7,400 m 2 ) Sports Club at a
height of 175 feet (53 m) above ground
level. [2]
100% recycling of water, rainwater
harvesting and solar water heating [4]
VRV Air Conditioning to save electricity[4]
Apartments
The building will have about 300 exclusive
homes, including 3-and-4-bedroom "World
Residences", "World Villas" with their own
private pools and a limited number of duplex
"World Mansions". [4]
Fittings
Kitchens – Bulthaup (Germany) [4]
Bathrooms – Antonio Lupi (Italy),
Dornbracht (Germany), Gessi (Italy), Villeroy
& Boch (Germany/France)
Flooring - Italian marble
Construction
Plot History
Srinivas Mills shut down in 1982. [15] Electricity
was cut off in 1984. 7000 people used to work
in the mill. [15] Then there was a court case that
went on for 22 years and in 2005 March the
Bombay High Court finally delivered its verdict:
Lodha Group will pay a total
160 crore ( US$ 31.92 million). 60 crore
will go to the ex-mill workers, many of
whom died before the court case was
finished. [15]
Lodha Group will build a spinning mill or
garment plant in Maharashtra on an area of
1 lakh sq feet to hire the former mill
workers or their relatives. [15]
In February 2011, the Civil Construction
contract has been given to a JV between
Arabian Construction Company and Simplex
Infrastructure for Rs 450 crore, to be completed
in 38 months. [16]
The tower will require: [4]
250,000 cubic metres of concrete
40,000 sq m of glass
35,000 tonnes of steel rebar
14 million man hours
Skyscrapers in india
India Tower Concept artwork showing the tower's proposed design. General information Status On hold Type Hotel, Residential, Retail Location Marine Lines Mumbai Coordinates 18.950159°N 72.821348°E Construction started 2010 Estimated completion 2016 Height Roof 700 m (2,300 ft) Technical details Floor count 126 Design and construction Architect Foster and Partners Developer Dynamix Balwas (DB) Realtors [1][2] References [3] India Tower (previously known as the Park Hyatt Tower ; also known as the Dynamix Balwas Tower or DB Tower ) is a 126-story, 700-metre (2,300 ft) supertall skyscraper that began construction in the city of Mumbai , India , in 2010. Construction work was put on hold in 2011. [3] If completed per its schedule in 2016, the India Tower will be the world's second- tallest building, after the Burj Khalifa in Dubai. Planning The Dynamix Balwas realtor group first proposed the project, under the name of Park Hyatt Tower , in 2008. The Dynamix Balwas proposal would have been an 85-storey tower with a height of 301.1 metres (988 ft). [4] The project was subsequently dropped, before being revived and amended in 2010. In January 2010, the Brihanmumbai Municipal Corporation authorised the tower's construction on a site located on Charni Road in Marine Lines , just north of Mumbai's historical district.
Thursday, 15 March 2012
Monday, 12 March 2012
T30 tower hotel construction
Watch "T30 Tower Hotel" on YouTube
19:27
Unknown

